Bridport, Dorset: 1200m²
Requirements: To overlay existing felt waterproofing to 6 buildings.
The specification included new roof insulation mechanically fixed through the old system and a Rubberbond EPDM fleece-backed single ply membrane adhered to new insulation.
 | Click on an image to view a larger version |
|